Risk matrix template

A 5 by 5 heat map of likelihood against impact, with eight risks placed on it and listed by score. The example is a store opening with a contractor who may finish late.

The Risk matrix template

What is a risk matrix?

A risk matrix is a grid that ranks risks by two questions: how likely is it, and how bad would it be? Each risk gets a number for both, the two are multiplied into a score, and the risk is placed in the cell where they meet. The colors of the grid then tell you which risks to deal with first.

This template gives you a 5 by 5 grid, a table that lists the risks by score and a legend for the four bands. It is filled in for “Downtown store opening”, due on Sep 4, 2027, with Nadia, the store manager, as risk owner.

The risk matrix template: a colored 5 by 5 grid of likelihood and impact with markers R1 to R8, and a table of the same risks on the right.
The whole board: the heat map on the left, the scored list on the right.

The grid: likelihood by impact

Likelihood runs up the side in five steps: 1 Rare, 2 Unlikely, 3 Possible, 4 Likely and 5 Almost certain. Impact runs along the bottom: 1 Minimal, 2 Minor, 3 Moderate, 4 Major and 5 Severe. Every cell prints its score in the corner, from 1 at the bottom left to 25 at the top right.

The scores fall into four bands, shown under the table: Low from 1 to 4, Medium from 5 to 9, High from 10 to 16 and Critical from 20 to 25. The cells are colored to match, green at the safe corner and red at the dangerous one. A round marker with the risk’s ID sits in its cell, so the top right of the grid is the first place anyone looks.

Risks drift toward the top right as they get more likely and more harmful.

The risk list behind the markers

A marker can only hold an ID, so the table beside the grid says what each one means. It has a row for every risk with its likelihood, impact, score and owner, sorted from the highest score down. At the top: “R1, Build-out contractor finishes late”, likelihood 4, impact 4, “16 · High”, owned by Pete.

The two numbers tell you more than the score alone. “Opening stock arrives late” scores 10 from a likelihood of 2 and an impact of 5. “Build-out costs run over budget” scores 12 from 4 and 3. The scores are close, but the risks are different animals: one is unlikely and severe, the other is likely and moderate. On the grid they sit far apart, which is the point of drawing it.

Eight risks sorted by score, with an empty R9 row for the next one.

Show where a risk lands after the response

A matrix that only shows today’s position invites worry and no action. This one adds the second half. R1 sits in the Likely row under Major, score 16. An arrow runs from it down to an outlined R1 in the Unlikely row, score 8. The note under the table explains the move: “a second crew on site moves R1 from 16 to 8.”

Look at what changed. The impact is still 4, because a late contractor would hurt just as much. The response cut the likelihood from 4 to 2. A good response names which of the two numbers it changes. If it changes neither, it is not a response.

The filled marker is the risk today; the outlined one is the target.

How to use the risk matrix template

  1. Open the template. Use this template places the store opening example on a board of your own.
  2. Score each risk. Agree first on what the words mean for your project, for example how many days or dollars make an impact Major. Then write likelihood, impact and their product in the table.
  3. Place it on the grid. Drag a marker into the cell that matches the two numbers and type the ID on it.
  4. Plan the response. Start with the Critical and High cells. Decide what lowers the likelihood or the impact, and who does it.
  5. Track where it lands. Add an outlined marker at the target cell, and update the Reviewed date in the header each time you go through the list.
Four bands turn a score into a priority.

When a matrix is the right tool, and when to use a register

The matrix is a picture for a meeting. It shows a sponsor in ten seconds which risks need attention, and it works for up to about fifteen risks before the markers pile up.

It has no room for actions, statuses or review dates. Keep those in a risk register, and treat the matrix as the summary on top of it. If you have not found your risks yet, run a pre-mortem first. For ranking ideas rather than dangers, the impact effort matrix uses the same kind of grid with different axes.

Questions about the Risk matrix template

How do you calculate a risk score?

Multiply likelihood by impact, each on a scale of 1 to 5. A likelihood of 3 and an impact of 4 give 12, which falls in the High band. On this board you type the score into the table yourself; the printed numbers in the grid cells help you check it.

What is the difference between a risk matrix and a risk register?

The matrix is a chart: it shows where every risk sits by likelihood and impact. The register is a list: it records the owner, the response, the action, the status and the next review of each risk. Teams usually keep the register and draw the matrix from it.

Should I use a 3 by 3 or a 5 by 5 risk matrix?

A 3 by 3 grid is quicker and fine for a small project. A 5 by 5 grid separates risks better when you have more than a handful, because fewer of them end up in the same cell. This template is 5 by 5; you can delete the outer rows and columns to shrink it.

Is the risk matrix template free to use?

Yes. It has 122 elements and fits a board on the Free plan, which allows 150. You can add markers and rows, change the band colors and export the result as PNG, SVG or PDF for a report.